The Hills Grammar School
Relec Switchboards ProjectThe Hills Grammar is a K-12 school that was founded in 1982, taking in roughly 1100 students every year, with about 79 kids being enrolled into their Early Childhood Education System a year and the school covers 53 acres of land.
Recently the schools Main Switchboard had a failure late in the night losing power to the site, All Zone Electrical attended & called Relec Switchboards to assist in creating a temporary solution to get power back on, keeping the school functional.
Relec Switchboards with All Zone Electrical provided the school with a new outdoor weatherproof Main Switchboard. All Zone Electrical replaced to old switchboard with minimal disruptions for students and staff.
Fault Level: 36kA RMS
Construction: Form 3b
IP Rating: IP56
Looking for a Power Distribution Switchboard?
Speak to the experienced team at Relec Switchboards today about your next project